Civic

Chennai Metro Phase-II work to begin

Chennai-Metro-Rail-Website

The construction of Phase-I of the Chennai Metro is nearing completion and authorities are keen to begin work for Phase-II, which will connect large parts of OMR with the city. A feasibility report for the same has been submitted to the Centre.

Land acquisition for the same is being undertaken. Phase- II will include the following lines:

Corridor 3: Madhavaram to Sholinganallur: via Perambur, Nungambakkam, Adyar, Thiruvanmiyur, Palavakkam, and Injambakkam

Corridor 4: CMBT (Koyambedu) to Light House.

Corridor 5: Madhavaram to Siruseri:  via Villivakkam, Padi, Nerkundram, Alwarthirunagar, Alandur, Puzhuthivakkam, Medawakkam and Kailash Nagar

The lines are expected to be completed by 2026, according to the feasibility report.

 

more from Civic

2017 11 29 Devaraj nagar park cover
Water still stagnating in Devaraj Nagar park

SHOLINGANALLUR: The rains have come and gone, and another spell is awaited, but the water...

read more
waterlogging omr ecr
OMR's vacant plots turn mosquito breeding grounds

After the rains, several vacant plots on OMR have seen waterlogging. As these areas are...

read more

Restaurants

2017 11 23 Ithiyas 1
New veg restaurant on OMR

OKKIYAM THURAIPAKKAM: A new vegetarian restaurant, Hotel Ithiyas Bhavan, was inaugurated...

read more
https://www.accorhotels.com/6715
Novotol-Ibis OMR opens doors

SHOLINGANALLUR: AccorHotels first combo branding hotel, Novotel and ibis OMR, opened its...

read more

Art Music Dance Drama

urban desi house
Open Art in Thoraipakkam cafe

THORAIPAKKAM: Artwork is invited from artists for the second edition of #Open Art, an...

read more
ananya
Rasikapriya concert spotlights Tamil compositions

NAVALUR--A concert of Tamil compositions was held at Olympia Panache in Navalur on April...

read more
View Archives